Tuesday, June 9, 2009

Kitchen Demo Begins


So far, there are 5 layers of flooring in the kitchen that have been ripped out. The old wood paneling was removed to expose a layer of drywall from probably the 70's. It was put up with 7,000 nails. Plaster walls are being ripped up from behing the stove/sink/fridge wall. That's got to be a fun job. Glad I'm here in NY for that!


No comments:

Post a Comment